Ted Hill Ted Hill
0 Course Enrolled • 0 Course CompletedBiography
CT-PT유효한덤프자료시험기출문제
ISTQB인증사에서 주췌하는 CT-PT시험은 IT업계에 종사하는 분이시라면 모두 패스하여 자격증을 취득하고 싶으리라 믿습니다. ExamPassdump에서는 여러분이 IT인증자격증을 편하게 취득할수 있게 도와드리는 IT자격증시험대비시험자료를 제공해드리는 전문 사이트입니다. ExamPassdump덤프로 자격증취득의 꿈을 이루세요.
ISTQB CT-PT 시험요강:
주제
소개
주제 1
- Types of Performance Testing: This section of the exam measures the skills of Software Test Analysts and covers various approaches such as load, stress, scalability, spike, endurance, concurrency, and capacity testing. It explains how each type evaluates system behavior under different conditions, helping testers and stakeholders understand how the system handles both expected and extreme usage scenarios.
주제 2
- Testing Types in Performance Testing: This section of the exam introduces the distinction between static and dynamic performance testing. It shows how reviews of requirements, architecture, and code can identify risks before coding is complete, and how runtime checks of resource utilization and response times reveal issues that only appear when the system is in operation.
주제 3
- Common Failures in Performance Testing and Their Causes: This section of the exam measures the skills of Performance Engineers and outlines frequent failure modes, including slow responses at various load levels, degraded performance over time, and system crashes under peak conditions. It provides examples of underlying causes such as resource leaks, insufficient capacity, and poor handling of spikes or concurrency, illustrating why robust planning and monitoring are crucial for reliable performance.
주제 4
- The Concept of Load Generation: This section of the exam measures the skills of Software Test Analysts and discusses how representative loads are modeled and produced to simulate user or process behavior. It explores methods such as user interface inputs, crowdsourcing, API-based calls, or protocol capture and playback, emphasizing the need for repeatable loads that accurately reflect real-world conditions.
CT-PT시험대비 덤프데모 - CT-PT높은 통과율 공부문제
IT전문가들이 자신만의 경험과 끊임없는 노력으로 작성한 ISTQB CT-PT덤프에 관심이 있는데 선뜻 구매결정을 내릴수없는 분은ISTQB CT-PT덤프 구매 사이트에서 메일주소를 입력한후 DEMO를 다운받아 문제를 풀어보고 구매할수 있습니다. 자격증을 많이 취득하면 좁은 취업문도 넓어집니다. ISTQB CT-PT 덤프로ISTQB CT-PT시험을 패스하여 자격즉을 쉽게 취득해보지 않으실래요?
최신 Software Testing & Quality CT-PT 무료샘플문제 (Q34-Q39):
질문 # 34
Which of the following is a key challenge when testing applications in a cloud environment?
- A. Limited ability to control test execution timing
- B. Inability to generate significant load
- C. Lack of user behavior simulation tools
- D. Test execution speed being too high
정답:A
설명:
One of the biggest challenges of cloud-based performance testing is the lack of control over test execution timing due to shared cloud resources. Cloud environments dynamically allocate computing power, meaning that test execution may vary due to background processes, VM migrations, or auto-scaling events.
Option B (Inability to generate load) is incorrect because cloud platforms can scale up resources to generate high loads.
Option C (Lack of behavior simulation tools) is incorrect because cloud providers offer robust testing tools.
Option D (Test execution speed being too high) is not a valid performance testing challenge.
질문 # 35
What is typically the result of oversaturation of system resources during performance testing?
- A. Response time will be slow under significant load levels.
- B. Response time will gradually improve over a period of time.
- C. Error logging will decrease.
- D. The size of the database will gradually decrease.
정답:A
설명:
When system resources are oversaturated (e.g., CPU, RAM, or network bandwidth), response times will degrade because the system struggles to process requests efficiently. This is a key performance bottleneck indicator.
Option A is incorrect because response times do not improve under heavy load; they typically worsen.
Option C is incorrect because error logging may actually increase rather than decrease under stress.
Option D is incorrect because database size is independent of system saturation unless records are actively purged.
질문 # 36
What is the primary purpose of a load generator?
- A. Record and analyze the behavior of the system as it is executing the prescribed tests
- B. Create a steady and consistent background load on the system
- C. Simulate user behavior in accordance with the defined operational profile
- D. Support root cause analysis when performance degradation is encountered
정답:C
설명:
A load generator is responsible for simulating virtual users and applying workloads to a system as defined by an operational profile. This allows testers to analyze how the system behaves under different load conditions.
Option A (Background load) is incorrect because load generators create simulated user interactions, not just background noise.
Option C (Record and analyze behavior) is the role of monitoring tools, not a load generator.
Option D (Support root cause analysis) is incorrect because root cause analysis is done after the load test, using monitoring tools.
질문 # 37
You are managing a project that is testing a system that manages a newly redesigned jet engine for heavy aircraft. Given the fact that this engine is specifically engineered to reduce noise, it is important that the software maintains enough thrust for lift for a period of 5 minutes without exceeding 87.5dB. The software must achieve this independent of other internal systems such as fuel or navigation management.
Given the risk for the ability of the aircraft to meet the noise abatement regulations while still being able to fly, when is the optimum time in the software lifecycle to apply the performance testing?
- A. Preferably at the end of system testing
- B. Preferably during system integration testing
- C. Preferably at the end of unit testing
- D. Preferably during each phase in the lifecycle
정답:D
설명:
Performance testing should be integrated into every phase of the software lifecycle to ensure that critical performance requirements (such as thrust-to-noise ratio) are met early and continuously validated.
Option B (End of system testing) is too late, as issues may be costly to fix at that stage.
Option C (During system integration testing) is useful but not comprehensive enough.
Option D (At the end of unit testing) is incorrect because unit tests do not assess overall system performance.
질문 # 38
You have run a load test. When examining the metrics, you see that the virtual users experienced many timeouts and excessive wait times. The system throughput metrics exceeded expected results, even during peak times.
Based on your analysis, what conclusion should you draw?
- A. Virtual users are exhibiting impatient behavior.
- B. New test data is needed.
- C. Network infrastructure should be investigated.
- D. Processing speed is too slow.
정답:D
설명:
If timeouts and excessive wait times occur, but throughput is high, this suggests that the system is unable to process requests fast enough. This points to slow processing speed due to CPU bottlenecks, memory limitations, or inefficient database queries.
Option A (Network infrastructure investigation) would be relevant if throughput was low or variable.
Option C (Impatient virtual users) is irrelevant; virtual users follow scripted behaviors.
Option D (New test data) does not address the core issue.
질문 # 39
......
ISTQB CT-PT덤프의 무료샘플을 원하신다면 우의 PDF Version Demo 버튼을 클릭하고 메일주소를 입력하시면 바로 다운받아ISTQB CT-PT덤프의 일부분 문제를 체험해 보실수 있습니다. ISTQB CT-PT 덤프는 모든 시험문제유형을 포함하고 있어 적중율이 아주 높습니다. ISTQB CT-PT덤프로ISTQB CT-PT시험패스 GO GO GO !
CT-PT시험대비 덤프데모: https://www.exampassdump.com/CT-PT_valid-braindumps.html
- CT-PT최신 업데이트 시험대비자료 🙂 CT-PT최신 덤프공부자료 🔇 CT-PT최신 업데이트 시험대비자료 🏙 지금( kr.fast2test.com )을(를) 열고 무료 다운로드를 위해⇛ CT-PT ⇚를 검색하십시오CT-PT시험문제집
- CT-PT최신 업데이트 시험대비자료 🥋 CT-PT최고덤프문제 🔀 CT-PT최신버전 인기 덤프자료 😆 무료로 다운로드하려면➡ www.itdumpskr.com ️⬅️로 이동하여▶ CT-PT ◀를 검색하십시오CT-PT최신버전 덤프샘플문제
- CT-PT유효한 덤프자료 시험준비에 가장 좋은인기 인증 시험덤프 ⏏ ▷ www.koreadumps.com ◁에서 검색만 하면「 CT-PT 」를 무료로 다운로드할 수 있습니다CT-PT시험유효덤프
- CT-PT최고덤프문제 👰 CT-PT시험패스 인증덤프 💰 CT-PT시험덤프 🐗 ⇛ www.itdumpskr.com ⇚웹사이트를 열고➽ CT-PT 🢪를 검색하여 무료 다운로드CT-PT최신 덤프공부자료
- 시험준비에 가장 좋은 CT-PT유효한 덤프자료 최신 덤프자료 📤 무료 다운로드를 위해 지금▛ www.koreadumps.com ▟에서「 CT-PT 」검색CT-PT최고품질 인증시험자료
- CT-PT 최신dumps: ISTQB Certified Tester - Performance Testing - CT-PT 응시자료 🥍 ➥ www.itdumpskr.com 🡄웹사이트를 열고➥ CT-PT 🡄를 검색하여 무료 다운로드CT-PT최고품질 인증시험공부자료
- CT-PT합격보장 가능 시험덤프 🪓 CT-PT인증시험 인기 시험자료 ⛰ CT-PT덤프샘플문제 체험 🙊 ➠ www.itcertkr.com 🠰웹사이트에서【 CT-PT 】를 열고 검색하여 무료 다운로드CT-PT최신버전 인기 덤프자료
- CT-PT최신버전 인기 덤프자료 🏇 CT-PT최신 업데이트 시험대비자료 🎒 CT-PT시험문제집 📑 ⇛ www.itdumpskr.com ⇚에서《 CT-PT 》를 검색하고 무료로 다운로드하세요CT-PT시험문제집
- CT-PT시험문제집 🧵 CT-PT최신 업데이트 시험대비자료 ❇ CT-PT최고품질 인증시험 기출문제 🏴 무료 다운로드를 위해➽ CT-PT 🢪를 검색하려면⏩ www.koreadumps.com ⏪을(를) 입력하십시오CT-PT시험유효덤프
- 퍼펙트한 CT-PT유효한 덤프자료 덤프샘플 다운로드 🦙 무료로 다운로드하려면⮆ www.itdumpskr.com ⮄로 이동하여【 CT-PT 】를 검색하십시오CT-PT시험덤프
- 퍼펙트한 CT-PT유효한 덤프자료 덤프샘플 다운로드 🥋 무료로 다운로드하려면➥ www.koreadumps.com 🡄로 이동하여☀ CT-PT ️☀️를 검색하십시오CT-PT시험유효덤프
- CT-PT Exam Questions
- learn-step.com academy.novatic.se edusq.com rdguitar.com sayhello.vn bhrigugurukulam.com edu.canadahebdo.ca akademi.jadipns.com wavyenglish.com samerawad.com